You are required to read and agree to the below before accessing a full-text version of an article in the IDE article repository.

The full-text document you are about to access is subject to national and international copyright laws. In most cases (but not necessarily all) the consequence is that personal use is allowed given that the copyright owner is duly acknowledged and respected. All other use (typically) require an explicit permission (often in writing) by the copyright owner.

For the reports in this repository we specifically note that

  • the use of articles under IEEE copyright is governed by the IEEE copyright policy (available at http://www.ieee.org/web/publications/rights/copyrightpolicy.html)
  • the use of articles under ACM copyright is governed by the ACM copyright policy (available at http://www.acm.org/pubs/copyright_policy/)
  • technical reports and other articles issued by M‰lardalen University is free for personal use. For other use, the explicit consent of the authors is required
  • in other cases, please contact the copyright owner for detailed information

By accepting I agree to acknowledge and respect the rights of the copyright owner of the document I am about to access.

If you are in doubt, feel free to contact webmaster@ide.mdh.se

Transformation Methods for Off-line Schedules to Attributes for Fixed Priority Scheduling

Fulltext:


Authors:


Publication Type:

Licentiate Thesis

Publisher:

Mälardalen University


Abstract

Off-line scheduling and fixed priority scheduling (FPS) are often considered as complementing and incompatible paradigms. A number of industrial applications demand temporal properties (predictability, jitter constraints, end-to-end deadlines, etc.) that are typically achieved by using off-line scheduling. The rigid off-line scheduling schemes used, however, do not provide for flexibility. FPS has been widely studied and used in a number of industrial applications, e.g., CAN bus, mostly due to its simple run-time scheduling and small overhead. It can provide more flexibility, but is limited with respect to predictability, as actual start and completion times of executions depend on run-time events.In this work we show how off-line scheduling and FPS run-time scheduling can be combined to get the advantages of both -- the capability to cope with complex timing constraints while providing run-time flexibility. The proposed approaches assume that a schedule for a set of tasks with complex constraints has been constructed off-line. We present methods to analyze the off-line schedule and derive FPS attributes, e.g., priorities, offsets, and periods, such that the runtime FPS execution matches the off-line schedule. The basic idea is to analyze the schedule and to derive task attributes for fixed priority scheduling. In some cases, i.e., when the off-line schedule can not be expressed directly by FPS, we split tasks into instances to obtain a new task set with consistent task attributes. Furthermore, we provide a method to keep the number of newly generated artifact tasks minimal.Finally, we apply the proposed method to schedule messages with complex constraints on Controller Area Network (CAN). We analyze an off-line schedule constructed to solve complex constraints for messages, e.g., precedence, jitter or end-to-end deadlines, and we derive attributes, i.e., message identifiers, required by CANs native protocol. At run time, the messages are transmitted and received within time intervals such that the original constraints are fulfilled.

Bibtex

@misc{Dobrin447,
author = {Radu Dobrin},
title = {Transformation Methods for Off-line Schedules to Attributes for Fixed Priority Scheduling},
number = {11},
month = {May},
year = {2003},
publisher = {M{\"a}lardalen University},
url = {http://www.es.mdu.se/publications/447-}
}