You are required to read and agree to the below before accessing a full-text version of an article in the IDE article repository.
The full-text document you are about to access is subject to national and international copyright laws. In most cases (but not necessarily all) the consequence is that personal use is allowed given that the copyright owner is duly acknowledged and respected. All other use (typically) require an explicit permission (often in writing) by the copyright owner.
For the reports in this repository we specifically note that
- the use of articles under IEEE copyright is governed by the IEEE copyright policy (available at http://www.ieee.org/web/publications/rights/copyrightpolicy.html)
- the use of articles under ACM copyright is governed by the ACM copyright policy (available at http://www.acm.org/pubs/copyright_policy/)
- technical reports and other articles issued by M‰lardalen University is free for personal use. For other use, the explicit consent of the authors is required
- in other cases, please contact the copyright owner for detailed information
By accepting I agree to acknowledge and respect the rights of the copyright owner of the document I am about to access.
If you are in doubt, feel free to contact webmaster@ide.mdh.se
Clustered Worst-Case Execution- Time Calculation
Publication Type:
Journal article
Venue:
IEEE Transactions on Computers
Abstract
Knowing the Worst-Case Execution Time (WCET) of a program is necessary when designing and verifying real-time systems. A correct WCET analysis method must take into account the possible program flow, such as loop iterations and function calls, as well as the timing effects of different hardware features, such as caches and pipelines. A critical part of WCET analysis is the calculation, which combines flow information and hardware timing information in order to calculate a program WCET estimate. The type of flow information which a calculation method can take into account highly determines the WCET estimate precision obtainable. Traditionally, we have had a choice between precise methods that perform global calculations with a risk of high computational complexity and local methods that are fast but cannot take into account all types of flow information. This paper presents an innovative hybrid method to handle complex flows with low computational complexity, but still generate safe and tight WCET estimates. The method uses flow information to find the smallest parts of a program that have to be handled as a unit to ensure precision. These units are used to calculate a program WCET estimate in a demand-driven bottom-up manner. The calculation method to use for a unit is not fixed, but could depend on the included flow and program characteristics.
Bibtex
@article{Ermedahl815,
author = {Andreas Ermedahl and Friedhelm Stappert and Jakob Engblom},
title = { Clustered Worst-Case Execution- Time Calculation},
volume = {54},
number = {9},
pages = {1104--1122},
month = {September},
year = {2005},
journal = {IEEE Transactions on Computers},
url = {http://www.es.mdu.se/publications/815-}
}