The main objective of the strategic recruitment within the project is to support efforts to identify requirements and develop a process for the electronics and software development, based on the needs Volvo CE will face in 2020. Examples of such challenges is the need for increased functionality that must be supported by electronic systems, where, for example, more advanced control functions are included, which contributes to the product as a whole becomes more advanced.
Evaluating performance in the development of software-intensive products (Dec 2013) Stefan Cedergren, Stig Larsson Information and Software Technology 54.7 (2012) (IST Vol 54 No 7)
Managing change in performance measures – An inter-company case study approach (2012) Mohammed Salloum, Stefan Cedergren Intenational journal of business science & applied management (IJBSAM)
Partner | Type |
---|---|
Volvo Construction Equipment AB | Industrial |